Woodberry Down Design Studio, 2026

Woodberry Down Design Studio, 2026

The Woodberry Down Design Studio is a continuation of the 2025 Woodberry Down pavilion and is the result of an on-going collaboration between RC/YYC and the pavilion project partners: the London Borough of Hackney; Notting Hill Genesis; and Berkeley Group.

The project responds to feedback from young people on the impact of the regeneration project and their relationship to it. Currently expected to complete in 2041, construction on Woodberry Down will have spanned three decades by the time it is finished. In that time, many original residents will have experienced significant change, with young residents spending their childhood living amongst building sites. 

Without any opportunity to meaningfully shape the changes taking place, young people are unlikely to feel a sense of ownership over the place they call home. This impact has been recorded in a 2024 Social Life study, finding that people under 25 years old are least likely to agree that the changes in the area are benefitting them or their families.

The Design Studio provides a platform for youth voices for the duration of the regeneration project, working alongside the delivery partners and contributing to the public realm in Woodberry Down through small-scale, permanent installations.

The Design Studio is a vehicle for long-term youth engagement on Woodberry Down, designed specifically to out-last any one project partner and offer a continuous point of contact for young people living in the area for the duration of the regeneration project.

The Woodberry Down Design Studio will begin recruiting at the beginning of the 2026–27 academic year, building upon relationships built with surrounding schools during the Woodberry Down pavilion recruitment. 

The studio’s inaugural design brief is to carry out a feasibility study for public furniture along the New River Path in collaboration with the Wildlife Trust.